15 dry-type transformers for Mumbai industrial park indoor substations, ensuring fire safety for manufacturing facilities.

Client Nigerian Federal Ministry of Power
Year 2023
Location Mumbai, India
Scope <p><strong>Project Scope:</strong></p><ul><li>15 × SCB10 dry-type transformers (1000 kVA each)</li><li>IP31 enclosures for industrial environment</li><li>Forced air cooling for overload capacity</li><li>SCADA integration for remote monitoring</li></ul><p><strong>Duration:</strong> 8 months</p>
Mumbai Industrial Park Distribution

Project Overview

A major industrial park development in Mumbai, India required reliable power distribution for multiple manufacturing tenants. Transformer Co. provided 15 units of dry-type transformers for indoor substations, ensuring fire safety and minimal maintenance.The project supports over 50 manufacturing facilities in the park, with a total installed capacity of 15 MVA.

12 units 120MVA power transformers
132kV / 33kV Voltage ratings
ONAN/ONAF Cooling systems
IEC 60076 International compliance
18 months Delivery timeline

Challenge

Operating in a tropical climate with extreme heat and humidity presented significant engineering challenges. Standard transformer designs would struggle under ambient temperatures regularly exceeding 40°C, requiring specialized insulation systems and robust cooling solutions to maintain reliable performance. Additionally, the logistics of delivering oversized equipment weighing over 120 tons each to sites in Lagos and the landlocked capital Abuja demanded innovative transport planning and modular packaging strategies to navigate Nigeria's road infrastructure.

Our Solution

We engineered custom-designed insulation systems rated for 55°C ambient temperature, exceeding the standard 40°C rating by a significant margin. Enhanced ONAF cooling with additional radiator banks was implemented to ensure optimal thermal management under peak load conditions. For logistics, we developed a modular packaging approach that allowed road transport to remote locations, with components reassembled on-site. Our engineering team provided comprehensive site supervision throughout the 18-month installation period, ensuring every unit was commissioned to exacting standards.

Project Gallery

Technical Specifications

Parameter Specification
Transformer Rating 120MVA
High Voltage 132kV
Low Voltage 33kV
Frequency 50Hz
Cooling ONAN/ONAF
Vector Group YNd11
Tap Changer On-load (OLTC)
Impedance 14%
Ambient Temperature 55°C (design)
Transport Weight ~120 tons

Results & Impact

2M+

Residents with improved electricity access

99.8%

Reliability rate achieved

18 months

On-time delivery

Zero

Major incidents since commissioning

The dry-type transformers from Transformer Co. have exceeded our expectations in terms of reliability and safety. Their team provided excellent technical support throughout the project. — Facility Manager, Mumbai Industrial Park

— Chief Engineer, Nigerian Federal Ministry of Power

Have a Similar Project?

Our engineering team can design the optimal transformer solution for your infrastructure project.

Related Projects

Dubai Solar Farm Step-Up Project
Industrial 2024

Dubai Solar Farm Step-Up Project

Middle East

12 custom step-up transformers for Dubai 700MW solar farm, supporting UAE clean energy strategy.

View Details
São Paulo Underground Distribution
Industrial 2023

São Paulo Underground Distribution

Americas

22 pad-mounted transformers for São Paulo underground distribution network, improving reliability for 800,000 residents.

View Details
Lagos 132kV Substation Project
Industrial 2024

Lagos 132kV Substation Project

Africa

Supply of 8 units 132kV power transformers for TCN Lagos substation, supporting grid expansion in Nigeria.

View Details